Skills
Computer literate (Microsoft word,excel,power point),
10+ Years
Experience highlights
Operation and Maintenance Supervising Engineer
MINISTRY OF ELECTRICITY AND WATER
·
November/2017
–
Present
• Responsible for testing, operation and maintenance of Telecom STM-1 SDH Huawei, Huawei Microwave RTN 950, Nokia Surpass Hit 7060 SDH, fiber optics and copper transmission.
• Involves and handles various roll out projects for microwave tower construction, civil works, installation of microwave cabinets, cable trays, feeder cable and tapping of power.
• Provides assistance to sub contractor for proper technical contribution guidance in troubleshooting.
Telecommunication Implementation Engineer
ETSI TECHNOLOGIES
·
November/2016
–
Present
• Installation, integration, implementation and commissioning Nokia L2100, L700, L850, U2100,U900, G900 and L1800/G1800.
• Alarm clearing and isolation, perform base band expansion.
• Conduct functionality test (field test voice and data) for new and swap out BTS.
• Perform power tapping, software updating.
• Conduct technical site survey and assessment.
• Transmission facility line up and structured cabling.
• Standing Wave Ratio testing and analysis
Telecommunication Engineer
NAHJ TECHNOLOGY
·
October/2015
–
Present
• Installation Ciena 6500 DWDM and Alcatel Lucent PS32, PS64 DWDM
• Site survey for fiber optic cable laying, do site floor plan and power specification
• Perform Optical Time-Domain Reflectometer testing, power insertion lose and power meter testing
• Perform fiber characterization, rectifier power tapping, fiber cable laying, assemble of racks and cabinets for Ciena and Alcatel-Lucent DWDM/SDH.
Installation, Integrator and Commissioning Field Engineer
ATLAS WIRELESS AND TELECOMMUNICATION INC
·
November/2014
–
Present
• Integration and commissioning Ericsson 6000 series, Nokia LTE L700, L2100 and L1900
• Perform Software updates and upgrades on customer's network.
• Remote support to general contractors on site during integration.
• Perform Voltage Standing Wave Ratio (VSWR) sweep test using site master.
• Termination of alarms at distribution frame panel, power cable to rectifier.
• Installation of ice bridge, perform ground cad weld attach to ground ring.
Signaling and Telecom Team Leader
SAUDI RAILWAY COMPANY (SAR)
·
June/2013
–
Present
• Operation and maintenance GSM-R Nokia-Siemens BTS 241,Keymile multiplexer UMUX 1500 and 1200 SDH, Ericsson OMS 1564 SDH, Close Circuit Television (CCTV), fiber optic cables splicing/networks, LAN/wireless fidelity (Wi-Fi)
• Quality assurance supervision and acceptance test for electromechanical management system
• Controls and coordinates subcontractors for the design and implementation construction of the telecom system
• Corrective Maintenance of all railway signaling and telecom equipment .